Новости компаний [4] |
Новости строительства [113] |
Что-то заработало неправильно. Главная страница
Строительная информация: 4. Constructive solutions The project envisages the planning of the territory with subsequent cutting of fertile soil. The foundations for the external and internal walls are designed as strip monolithic ones, sealed with sand preparation with a thickness of 100 mm. A reinforced concrete belt with a thickness of 150 mm is arranged on the foundation blocks. Horizontal waterproofing of the foundations is performed from two layers of roofing material with waterproof mastic. The outer walls of the basement, which are in contact with the soil, should be coated with hot bitumen in 2 coats. The masonry of the walls is made of hollow effective brick M-125 on mortar M-25. Jumpers - prefabricated reinforced concrete blocks. When performing the work, it is necessary to ensure that the load-bearing bars of the jumpers were locked from the abutment side of the floor elements and staircase landings. Lay the jumpers on the M-50 mortar. Ceilings - designed from prefabricated reinforced concrete panels with voids. All panels are anchored in the masonry of the outer walls and on the middle wall. The insulation of the attic floor is expanded clay. Panels are laid on a layer of M-100 cement mortar. Wooden beam ceiling, beams 160х140 mm.
Факт о строительстве: 5. Fire protection requirements and protection of structures from corrosion All metal parts and welded joints must be protected by anti-corrosion coatings. The composition and method of application of the anti-corrosion coating must be determined in accordance with the requirements of SNIP Sh-23-76. Anchors of floor slabs are protected with cement mortar according to SNIP P-28-73. wooden The distance from the smoke channel to the wood should be at least 380 mm. In those cases, when the distance is 250 mm, a felt pad is made, which is pre-moistened in clay. The crate is cut at a distance of 130 mm. from chimneys.